OILCOM Jabana fuel depot expansion progressing.
IDCC is leading the prefeasibility study for an additional 35 million litres of storage at the existing Jabana depot.

Welcome to IDCC Ltd
A Rwandan engineering and construction firm specialised in safety-critical civil works for fuel and LPG depots — tank farms, bunds, foundations and depot infrastructure — complemented by feasibility, design and supervision consultancy.
IDCC is leading the prefeasibility study for an additional 35 million litres of storage at the existing Jabana depot.
Full technical, economic and regulatory feasibility submitted; Certificate of Good Completion received.
Earthworks, retaining walls and sphere tank ring foundations now under active construction.
WHAT WE BUILD

Fuel & LPG depot construction — tank foundations, ring beams and pads, bunds (dyke walls and floors) with impermeable lining, pump-house and pipe-rack foundations, weighbridges, hardstands, internal roads and drainage, built to API-650 / API-620 and fire-safety standards.

Alongside construction, IDCC offers complementary consultancy — feasibility, engineering design, regulatory compliance, ESIA / RAP and construction supervision — for petroleum, LPG, power and road infrastructure.
A track record across petroleum, LPG, transmission and road infrastructure delivered for Rwandan public and private clients.

Petroleum · Jabana, Kigali, Rwanda
OILCOM Rwanda Ltd · 2025 — Ongoing

Regulatory · Republic of Rwanda
Ministry of Trade and Industry (MINICOM) · 2025

LPG · Rusororo, Gasabo District, Kigali
Private Investor · Ongoing

Strategy · Republic of Rwanda
Ministry of Trade and Industry (MINICOM) · 2021
Why IDCC for Fuel Depot Civil Works
For the immediate national priority of putting up depot and tank-farm infrastructure as a short-term solution to the strategic-reserve shortfall, IDCC offers a combination of capabilities that are difficult to assemble at short notice
Direct, recent construction experience on large fuel and LPG depots in Rwanda — not only design, but built work.
Tank foundations, bunds, drainage, roads, pump-house and pipe-rack foundations, weighbridges and ancillary civils delivered as an integrated package.
An owned-and-hired fleet of heavy plant, concrete-production, lifting, dewatering and survey/QA equipment sized for multiple parallel work fronts.
API-650/620 foundations, documented inspection and test plans, and an independent close-out and handover process.
Established working relationships with MINICOM, RURA and sector stakeholders, and experience in fuel-sector studies and standards.